Português (pt-PT)English (United Kingdom)
f.jpg

Investor’s Guide

A+ A- A

Railway accessibilities

ZILS is connected to the national and international railway network through electrified railway starting at the sea port. There are dedicated railway lines connecting some areas of the Industrial Zone to the national grid.


The train connection from ZILS to the Sines Port the network is 17.03 km long There are 11.60 km of railway within ZILS´s perimeter.


ZILS is served by Sines railway line (72 km) connecting Sines port to the south line (Lisbon - Algarve). Railway connections to Spain will be improved soon, reducing distances and travel time.

Current distances:

 

SINES / ELVAS / BADAJOZ / MÉRIDA   ---> 539 Km

SINES / MARVÃO / VAL.ÁLCANTARA / CÁCERES   ----> 531 Km

SINES / ELVAS / BADAJOZ / MADRID    ----> 930 Km

 

 

Significant changes are planned on the railway, the distances will be:

 

SINES / BADAJOZ / MÉRIDA   ---> 294 Km

SINES / BADAJOZ / CÁCERES   ----> 355 Km

SINES / ELVAS / BADAJOZ / MADRID    ----> 730 Km

 

Know more at:

http://www.cp.pt
http://www.refer.pt


 

For more information, please refer to the following PDF document:

 

 

Site Map    © 2015 . Developed by