Sines Industrial and Logistic Zone (ZILS) has a vast power grid in high voltage (60 Kv), very high voltage (150 Kv and 400 Kv) and medium voltage (15 a 30 Kv). There are two electrical substations nearby ZILS that allow the future edification of dedicated lines in case of growing consumption needs.
The areas with lots have immediate access to the existing medium voltage power grid (30 Kv), making 300 KVA of electric power available per hectare. Consult available electric power per lot by consulting the data sheets. It can be possible to increase the installed electric capacity depending on a positive technical opinion from aicep Global Parques and related licensing entities.
In what concerns the selection of the electrical energy supplier, with the opening of the energy market, the consumers are able to choose the electrical energy operator.
Clicking here you can find the current energy suppliers operating in mainland Portugal.
|